References Biogas Plants

Over the years, our ULTRAWAVES high- performance ultrasound systems have been installed in many biogas and waste fermentation plants nationally and internationally in order to promote the intensification of the anaerobic biomass fermentation.

Improvement of digestion process in farmland biogas plants (FBP) and food waste biogas plant for electrical power generation

  • Mariks FWBP, Germany (1,100 kW)
    Full-scale installation since 2012
    • increase in power generation of 13%
    • reduction of VS content in digastate from 56% to 52%
  • Beerlage FBP, Germany (1,500 kW)
    Full-scale installation since 2016
    • Start-up in December 2016, results will be added within a short time
  • Bispingen FBP, Germany (1,100 kW)
    Full-scale installation since 2008
    • increase in biogas and power generation of 14%
    • reduction in substrate costs of 5%
  • Bordesholmerland FBP, Germany (1,600 kW)
    Full-scale installation since 2011
    • saving substrate costs of 9% at constant biogas generation
    • increase in methane content of 4% and therefore increased power generation
      • installation of a second HPUS-system in July 2012
  • Gönnebek FBP, Germany (1,600 kW)
    Full-scale test in 2012
    • increase in biogas and power generation of 8% at constant feeding
  • Hellweg FBP, Germany (500 kW)
    Full-scale installation since 2016
    • Start-up in September 2016, results will be added within a short time
  • Hermannshof FBP, Germany (1,300 kW)
    Full-scale test, 2012
    • increase in biogas and power generation of 8%
    • reduction in substrate costs of 5%
  • HKS Wittenburg FBP, Germany (716 kW)
    Full-scale installation since 2012
    • increase in biogas and power generation of 14% at constant feeding
  • Koop FBP, Germany (590 kW)
    Full-scale installation since 2015
    • reduction of substrate costs of 11% at constant biogas generation
    • increase in methane content of 1% and therefore increased power generation
  • Lindow FBP, Germany (500 kW)
    Full-scale installation since 2008
    • saving substrate costs of 13% at constant biogas and power generation
  • Wesel FBP, Germany (500 kW)
    Full-scale test in 2007
    • increase in biogas and power generation of 19% at constant feeding
  • Wulkow FBP, Germany (400 kW)
    Full-scale installation since 2015
    • increase in biogas and power generation of 10% at constant feeding

Picture gallery

Contact Person Contact
Marianne Jordan
(Management Assistant)

+49 (40) 32507203
info@ultrawaves.de
Events
Biogas Convention & Trade Fair
Nuremberg (Germany)
12 - 14/12/2017
Lecture at the biogas - expo & congress
Offenburg (Germany)
31/01/2018
IFAT 2018
Munich (Germany)
14 - 18/05/2018
more events…